22 September 2014 - 1 January 0001,
18:00-00:00
-
Hitchin Flyover
CIHT Thames & Chilterns Branch Event:
HITCHIN FLYOVER
Date: Monday 22nd September 2014, at 6:15pm (refreshments from 6.00pm)
Speaker: David Moreland, Pre Contract Director - VolkerRail
Venue: VolkerHighways Ltd, Hertford Road, Hoddesdon, Hertfordshire, EN11 9BX
Cost: FREE to attend
Network Rail are building a flyover at Hitchin to prepare for increased demand on the East Coast Main Line. The flyover will carry trains between London and Cambridge over the main line, opening up one of the main bottlenecks at Cambridge Junction.
The new flyover will:
· Allow more services per hour to and from London
· Reduce delays by nearly 30,000 minutes each year, making the railway more punctual and reliable
· Keep a Hitchin-Cambridge line open during essential maintenance
David Moreland from VolkerRail will lead this evening talk, detailing the project so far.
How to Book a Place
It is always preferable to book your place, numbers are limited so please book early to avoid disappointment.
Keep up-to-date with the Thames and Chiltern Branch
Don't forget you can join our exclusive Thames and Chilterns Branch Linkedin group to find out about all our upcoming events and contribute in various discussions.
Click here to join